Project – Removal of existing lead and timber roof structure. Reconstructed to new design and incorporating new stainless steel brackets for the installation of photovoltaic panels. Overhaul and replacement of existing cast iron rainwater goods
For the PCC st Michael de Rupe Church with S Cartlidge, Architect
- st michael de rupe church prior to work commencing
- re-fxing lead bay lifted by high winds and prior to work commencing
- new timber roof mid-construction
- photovoltaic panel bracket incorporated within new roof structure
- masonry rebuild and lead capping, with protective bitumen coating, to top of wall
- new lead roof nearing completion
- completed lead roof with brackets in position for photovoltaic panel installation
- lead capping and re-setting of copings to east wall
- overhauled rainwater goods and reconfigured drainage connections