Project – Path improvements requiring the removal of the original river washed cobble path with laying of Welsh pennant flags to form a level and trip-free point of access into the church. Stepped access at the gated Churchyard entrance became ramped. The cobbles at the verges of the new path were reinstated in lime mortar.
For the PCC, St Peter’s Church, Tiverton with Russ Palmer, Architect
- church path prior to alteration
- church path prior to alteration
- path alteration commenced
- pennant path nearing completion
- river-washed cobbles being reinstated
- completed path
- completed path with new ramp and reinstatement of adjoining cobbles
- completed path and ramp
- path edge with reinstated cobbles